Our Focus

Project Gallery:


Large electrical transformer windings at in-process inspection.

Supercritical boiler economizer elements inspection final inspection.

Uninterruptible power supplies switch gear at inspection and test witness.

Stainless steel oxygen reactor at nozzles welds and dimensional check.

Supercritical boiler baffle wall panel inlet header at welds inspection and dimensional check.

Boiler front wall panels welding & dimensional inspection

Boiler primary super heater outlet header at in-process welding & dimensional check.

Super critical boiler panels tube-membrane welds inspection.

Complete supercritical boiler wall panel at final inspection.

Final, pre-delivery inspection of a 450 mva dual volts generator transformer, western Canada utility.

Pre-tanking, internals inspection of a 450 mva dual volts, generator transformer, western Canada utility.

Electrical and performance testing witness of a 450 mva dual volts, generator transformer, western Canada utility.

Inspection of welding, dimensional, workmanship and assembly of a 600 ft. long, inclined, bent conveyer system galleries- Ontario pulp mill.

Field welding, fit-up and workmanship inspection of structural steel and pressure piping-cement plant.

Welding, dimensional, workmanship and pressure test witness of a steam turbine gland superheater - western Canada utility.

Field welding, fit-up, visual, dimensional and workmanship inspection of large structural beams - cement plant.

Inspection of welding, workmanship, dimensions, assembly of transmission line steel towers - western Canada mining company.

Electrical tests and performance tests witness of 2600 hp ID fans electrical motors-mid Canada utility.

Projects Completed Successfully

Kimberly Clark Inc., Terrace Bay Mill, Ontario,

Project: Equipment: Manufacturer:
Oxygen Reactor 108" ID x 115 vessel
138" ID x 148 vessel
Design pressure: 120 psig @275deg.F
Material: SA 240-S31803 SS
Ellett Industries Inc.
Port Coquitlam, B.C.
Brown Stock Batch Digesters Ten units batch digesters
55 long pressure vessels x 1603/4" ID
Design pressure 168@375deg.F.

Material: SA 285C, 0.03% max Si content

1.875" thick plates

Beaird Industries Inc.
Shreveport, Louisiana
# 2 Mill Screens SS Pressure Piping A240 Gr. TP 316 SS Pressure Piping
spools welding and forming
PARR Metals Fabrication

Winnipeg, Manitoba

Mill Recovery Boiler,
Cold side generating tube banks
ASTM SA219, 2.5" x 0.165" MW boiler tubes Babcock & Wilcox Canada

Cambridge, Ontario

Low Temperature Super Heater ASTM, SA210-A1, 2" OD x 0.165" MW
super heater banks
Babcock & Wilcox Canada
Melville, Saskatchewan
Low Temperature Super Heater ASTM, SA210-A1, 2" OD x 0.180" MW Babcock & Wilcox Canada
Cambridge, Ontario
Cascading Cross Flow Economizer Banks ASTM, SA210-A1, 3" OD x 0.180" MW Babcock & Wilcox Canada

Cambridge, Ontario

Recovery Boiler # 2 Platens ASTM, SA210-A1, 2.5" OD x 0.220"MW Babcock & Wilcox Canada
Cambridge, Ontario
Boiler Panels ASTM, SA210-A1, 2.5" OD x 0.220"MW Babcock & Wilcox Canada
Cambridge, Ontario

EPCOR Power Development Corporation (Edmonton Power Previously), Edmonton, Alberta,
Genesee Generating Station, Unit GP3 (new unit, 450 MW addition)
Supplier: Babcock-Hitachi, K.K Edmonton, Alberta
Manufacturer: Babcock & Wilcox Canada, Cambridge, Ontario & Melville. Saskatchewan Shops

Equipment:

Supercritical Boiler consisting of:

Economizer Outlet Banks,
Primary Super Heater Outlet Banks,
Convection Pass Right Side Wall Panels,
Convection Pass Baffle Wall Panels,
Convection Pass Rear Wall panels,
Economizer Inlet Header
Convection Pass Side Wall Inlet Header
Convection Pass Baffle Wall Inlet Header
Convection Pass Baffle Wall Outlet Header
Primary Super Heater Inlet Banks
Convection Pass Front Wall panels
Convection Pass Rear Wall panels,
Convection Pass Left Side Wall Panels,
Primary Re-Heater Inlet Header
Convection Pass Front Wall Inlet Header
Convection Pass Rear Wall Inlet Header
Convection Pass Side Wall Outlet Header
Convection Pass Front Wall Outlet Header

ATCO Power, Fort McMurray, Alberta
Muskeg River Oil Sands Project, Cogeneration Station
Horizontal Spray Tray Deaerator Heater
Supplier: Ecodyne Limited, Burlington, Ontario
Manufacturer: Alps Welding, Concord, Ontario
2743 mm OD x 9144 mm long vessel
SA 516, Gr. 70 steel plates

Edmonton Power (Currently EPCOR Generation), Edmonton, Alberta
Clover bar Generating Station
# 5 and 6 Boiler Feed Water Heaters Replacement
41-1/2" ID x 30 2-7/8" long vessel
Design Pressure: shell side 310 psig, tubes side 2700 psig
Design temperature shell side 750/450 deg. F, tube side 400 deg. F.
Material SA 516, Gr., 70
Manufacturer: Foster Wheeler Canada Ltd., St. Catharines , Ontario

  Bookmark EliaSupervision.com
  Send to a Colleague
Home | Profile | Services | Clients | Focus | Contact | Privacy

Copyright 2003 - 2019 by Elia Supervision Inc. All rights reserved.                Web site solution designed & developed by SGJP design